sketch.kurai.ltd

Product Tool layout studies

Three takes on the same product surface — calm editorial, linear-dense, and split-focus. Each is a self-contained single-page demo. Pick one to enter.

01 · light

Calm Editorial

Generous whitespace, big type, slow rhythm. Reads like a magazine — for thoughtful, low-density browsing.

Open variant
02 · dark · dense

Linear Dense

Compact rows, monospace numerals, max information density. Power-user territory; everything one keystroke away.

Open variant
03 · split-pane

Split Focus

List on the left, detail on the right. Optimised for AI-assisted workflows where context and action live side-by-side.

Open variant
Design Calibration Studies

19 brand design systems rendered, self-critiqued via vision, and iterated to fidelity. Each card links to the live HTML study — click to explore.

Linear Issue list (sidebar + grouped rows + filters) (desktop)
Linear 4.6
Issue list (sidebar + grouped rows + filters)
Stripe Pricing + payment form (mobile-aware) (desktop)
Stripe 4.5
Pricing + payment form (mobile-aware)
Vercel Deployment list / project dashboard (desktop)
Vercel 4.75
Deployment list / project dashboard
Notion Editor + sidebar with blocks (desktop)
Notion 4.5
Editor + sidebar with blocks
Supabase Database table editor
Supabase 4.0
Database table editor
Raycast Command palette
Raycast 4.5
Command palette
Apple Product hero + feature tiles (mobile-aware) (desktop)
Apple 5.0
Product hero + feature tiles (mobile-aware)
Sentry Issue stream (desktop-intent) (desktop) Sentry Issue stream (desktop-intent) (mobile)
D
M
Sentry 4.0
Issue stream (desktop-intent)
Spotify Now-playing + playlist sidebar (mobile-aware) (desktop) Spotify Now-playing + playlist sidebar (mobile-aware) (mobile)
D
M
Spotify 4.0
Now-playing + playlist sidebar (mobile-aware)
Figma Design tool (canvas + layers + inspector) (desktop)
Figma 4.8
Design tool (canvas + layers + inspector)
Mintlify Documentation page
Mintlify 4.75
Documentation page
Cursor IDE editor + AI chat panel (desktop)
Cursor 4.4
IDE editor + AI chat panel
Resend Calibration study (desktop) Resend Calibration study (mobile)
D
M
Resend 5.0
Calibration study
Posthog Analytics dashboard (desktop-intent) (desktop) Posthog Analytics dashboard (desktop-intent) (mobile)
D
M
Posthog 4.0
Analytics dashboard (desktop-intent)
Warp Terminal (block-based UI) (desktop)
Warp 4.7
Terminal (block-based UI)
Cohere AI playground / dashboard
Cohere 4.25
AI playground / dashboard
Cal Calibration study (desktop) Cal Calibration study (mobile)
D
M
Cal 2.0
Calibration study
Replicate Model detail page
Replicate 4.5
Model detail page
Airbnb Search results card grid (mobile-aware) (desktop) Airbnb Search results card grid (mobile-aware) (mobile)
D
M
Airbnb 5.0
Search results card grid (mobile-aware)
Intercom Inbox (support agent workspace)
Intercom 4.4
Inbox (support agent workspace)
Coinbase Calibration study (desktop)
Coinbase 2.0
Calibration study
Claude Chat interface (desktop)
Claude 4.7
Chat interface
Framer Design editor (canvas + layers + inspector + toolbar) (desktop)
Framer 4.8
Design editor (canvas + layers + inspector + toolbar)
Miro Infinite canvas whiteboard
Miro 4.8
Infinite canvas whiteboard
Airtable Grid view (spreadsheet database)
Airtable 4.0
Grid view (spreadsheet database)
x.ai (Grok) Chat interface (conversation + sidebar)
x.ai (Grok) 4.6
Chat interface (conversation + sidebar)
Webflow Designer editor (desktop)
Webflow 5.0
Designer editor
Pinterest Home feed masonry grid (mobile-aware) (desktop) Pinterest Home feed masonry grid (mobile-aware) (mobile)
D
M
Pinterest 4.0
Home feed masonry grid (mobile-aware)
Wise Multi-currency dashboard (balance cards + convert + transactions) (desktop) Wise Multi-currency dashboard (balance cards + convert + transactions) (mobile)
D
M
Wise 4.5
Multi-currency dashboard (balance cards + convert + transactions)
Revolut App main screen (balance + cards + transactions) (desktop)
Revolut 4.7
App main screen (balance + cards + transactions)
Mongodb Atlas cluster dashboard (desktop-intent) (desktop) Mongodb Atlas cluster dashboard (desktop-intent) (mobile)
D
M
Mongodb 4.0
Atlas cluster dashboard (desktop-intent)
Kraken Pro trade interface (desktop) Kraken Pro trade interface (mobile)
D
M
Kraken 4.4
Pro trade interface
Clickhouse SQL playground (desktop-intent) (desktop) Clickhouse SQL playground (desktop-intent) (mobile)
D
M
Clickhouse 4.0
SQL playground (desktop-intent)
Superhuman Email client inbox (desktop)
Superhuman 4.6
Email client inbox
Linear (Mobile) Issue list — mobile-first rebuild (desktop) Linear (Mobile) Issue list — mobile-first rebuild (mobile)
D
M
Linear (Mobile) 4.6
Issue list — mobile-first rebuild
Stripe (Mobile) Pricing + payment form — mobile-first rebuild (desktop) Stripe (Mobile) Pricing + payment form — mobile-first rebuild (mobile)
D
M
Stripe (Mobile) 4.5
Pricing + payment form — mobile-first rebuild
Notion (Mobile) Block editor — mobile-first rebuild (desktop) Notion (Mobile) Block editor — mobile-first rebuild (mobile)
D
M
Notion (Mobile) 5.0
Block editor — mobile-first rebuild
Vercel (Mobile) Deployments dashboard — mobile-first rebuild (desktop) Vercel (Mobile) Deployments dashboard — mobile-first rebuild (mobile)
D
M
Vercel (Mobile) 4.0
Deployments dashboard — mobile-first rebuild
Figma (Mobile) Canvas editor — mobile-first rebuild (desktop) Figma (Mobile) Canvas editor — mobile-first rebuild (mobile)
D
M
Figma (Mobile) 4.0
Canvas editor — mobile-first rebuild
Sentry Issue stream (issue list) (desktop) Sentry Issue stream (issue list) (mobile)
D
M
Sentry 4.3
Issue stream (issue list)
Linear Issue list (gym clone) (desktop) Linear Issue list (gym clone) (mobile)
D
M
Linear 4.3
Issue list (gym clone)
Cal.com (Mobile) Booking flow — mobile-first rebuild (horizontal date scroller, sticky CTA) (desktop) Cal.com (Mobile) Booking flow — mobile-first rebuild (horizontal date scroller, sticky CTA) (mobile)
D
M
Cal.com (Mobile) 4.8
Booking flow — mobile-first rebuild (horizontal date scroller, sticky CTA)
Wise (Mobile) Multi-currency dashboard — mobile-first rebuild (vertical convert, 57px balance) (desktop) Wise (Mobile) Multi-currency dashboard — mobile-first rebuild (vertical convert, 57px balance) (mobile)
D
M
Wise (Mobile) 4.6
Multi-currency dashboard — mobile-first rebuild (vertical convert, 57px balance)
Coinbase (Mobile) Asset/trade page — mobile-first rebuild (price hero, sticky blue Buy CTA) (desktop) Coinbase (Mobile) Asset/trade page — mobile-first rebuild (price hero, sticky blue Buy CTA) (mobile)
D
M
Coinbase (Mobile) 4.4
Asset/trade page — mobile-first rebuild (price hero, sticky blue Buy CTA)
PostHog Trends / insights analytics dashboard (dark product surface) (desktop) PostHog Trends / insights analytics dashboard (dark product surface) (mobile)
D
M
PostHog 4.4
Trends / insights analytics dashboard (dark product surface)
Mistral.ai Le Chat AI playground (desktop)
Mistral.ai 4.5
Le Chat AI playground
Together.ai Model playground (inference + API) (desktop)
Together.ai 4.6
Model playground (inference + API)
RunwayML Video AI editor (generation tray + canvas) (desktop)
RunwayML 4.6
Video AI editor (generation tray + canvas)
ElevenLabs Text-to-speech studio (text + voice + waveform) (desktop)
ElevenLabs 4.4
Text-to-speech studio (text + voice + waveform)
Ollama Model library (local LLM management) (desktop)
Ollama 4.6
Model library (local LLM management)
OpenCode.ai AI coding TUI (chat + diff + tools) (desktop)
OpenCode.ai 4.4
AI coding TUI (chat + diff + tools)
Minimax AI chat/playground interface (desktop)
Minimax 4.2
AI chat/playground interface
NVIDIA Developer dashboard (NGC/GPU cloud) (desktop)
NVIDIA 4.3
Developer dashboard (NGC/GPU cloud)
HashiCorp Terraform Cloud dashboard (desktop)
HashiCorp 5.0
Terraform Cloud dashboard
Uber Ride-hailing app (map + bottom sheet) (desktop)
Uber 4.78
Ride-hailing app (map + bottom sheet)
IBM Carbon Design dashboard (desktop)
IBM 4.0
Carbon Design dashboard
Zapier Automation dashboard (desktop)
Zapier 5.0
Automation dashboard
Lovable AI app builder (desktop)
Lovable 4.6
AI app builder
Expo EAS build dashboard (desktop)
Expo 5.0
EAS build dashboard
Sanity Studio CMS (content editor) (desktop)
Sanity 4.6
Studio CMS (content editor)
SpaceX Mission control / tracker (desktop)
SpaceX 4.8
Mission control / tracker
Clay CRM / contact enrichment workspace (desktop)
Clay 5.0
CRM / contact enrichment workspace
Composio Integration Hub dashboard (tool catalog + activity + code terminal) (desktop) Composio Integration Hub dashboard (tool catalog + activity + code terminal) (mobile)
D
M
Composio 4.4
Integration Hub dashboard (tool catalog + activity + code terminal)
VoltAgent Agent engineering platform (desktop)
VoltAgent 4.4
Agent engineering platform
BMW Car configurator (3 Series) (desktop)
BMW 4.6
Car configurator (3 Series)
Vercel Project dashboard / deployment list (re-clone 2026-08-03) (desktop) Vercel Project dashboard / deployment list (re-clone 2026-08-03) (mobile)
D
M
Vercel 4.25
Project dashboard / deployment list (re-clone 2026-08-03)
Sentry Issue stream / error list (gym reference clone — desktop-intent, mobile column-pruned) (desktop) Sentry Issue stream / error list (gym reference clone — desktop-intent, mobile column-pruned) (mobile)
D
M
Sentry 4.4
Issue stream / error list (gym reference clone — desktop-intent, mobile column-pruned)
BMW Model overview (cinematic hero + showroom trim table + tech specs) (desktop) BMW Model overview (cinematic hero + showroom trim table + tech specs) (mobile)
D
M
BMW 4.4
Model overview (cinematic hero + showroom trim table + tech specs)
Superhuman Split inbox (split-inbox v2: 5.0 CALIBRATED desktop, mobile collapse added) (desktop) Superhuman Split inbox (split-inbox v2: 5.0 CALIBRATED desktop, mobile collapse added) (mobile)
D
M
Superhuman 4.7
Split inbox (split-inbox v2: 5.0 CALIBRATED desktop, mobile collapse added)
Stripe Pricing v2 — interactive cost calculator + comparison matrix (gym re-drill 2026-09-08) (desktop) Stripe Pricing v2 — interactive cost calculator + comparison matrix (gym re-drill 2026-09-08) (mobile)
D
M
Stripe 4.4
Pricing v2 — interactive cost calculator + comparison matrix (gym re-drill 2026-09-08)
Vercel Deployments clone (gym reference drill) (desktop) Vercel Deployments clone (gym reference drill) (mobile)
D
M
Vercel 4.4
Deployments clone (gym reference drill)
MongoDB Atlas Database Deployments grid (sidebar + deployment cards + type filters) (desktop) MongoDB Atlas Database Deployments grid (sidebar + deployment cards + type filters) (mobile)
D
M
MongoDB 4.6
Atlas Database Deployments grid (sidebar + deployment cards + type filters)
Clay Enrichment workspace re-drill (credits meter + waterfall, mobile-native) (desktop) Clay Enrichment workspace re-drill (credits meter + waterfall, mobile-native) (mobile)
D
M
Clay 4.8
Enrichment workspace re-drill (credits meter + waterfall, mobile-native)
PostHog Funnels insight (breakdown funnel by browser) (desktop) PostHog Funnels insight (breakdown funnel by browser) (mobile)
D
M
PostHog 2.5
Funnels insight (breakdown funnel by browser)